Sequoia National Forest

Lake Isabella Auxiliary Dam Left Abutment Project

printerPrintable Version

This project proposes to restore the height of the Isabella Auxiliary Dam at its junction with the left abutment through the construction of a 200-foot long earthen embankment between the eastern tip of the dam and Highway 178.

 Decision Notice and Finding of No Significant Impact, October 2010 (174kb pdf)

 Cover Letter for the Draft Environmental Assessment (EA), September 2010 (531kb pdf)

 Draft EA and Finding of No Significant Impact (FONSI), September 2010 (6.5mb pdf)


 
 
 
 
USDA logo which links to the department's national site. Forest Service logo which links to the agency's national site.